Welcome to Li Feng Machinery official website to learn more, please call 400-1183-918

中文 | Sitemap | RSS | XML |
Pulping equipment

Pressure screen of the pipeline configuration?

Date:2017-11-24 Author: Click:

Pressure screen pipe configuration.

1, into the slurry pipe: installed on the valve, set aside the bypass pipe into the slurry pipe to prepare for washing drums and shell. Into the slurry pressure of 0.1-0.25Mpa.

2, out of the tube: installed on the valve, the diameter of the pulp out of pulp diameter configuration, pulp and pulp into the mouth of the pressure difference between 0.01-0.04Mpa.

3, the end of the slurry tube: installed on the valve, tail pulp tube diameter tail pulp diameter size configuration, tail pulp mouth opening according to the type and quality of the pulp.

4, mechanical seal water pipe: water pressure: higher than into the slurry pressure 0.05Mpa flow: 6-12L / min 5, exhaust pipe: The tube is set at the top of the cover for the discharge of air inside the machine, which should be configured Valve, and hose connection for external connection, easy to lift the cover rotation.


Url:http://en.lifengzaozhi.com/news/371.html

Tag:废纸脱墨

Browse:

Welcome to leave message
Please input the message here, we will contact you as soon as possible.
Name
Name
Phone
Phone
Email
Email
Adress
Adress