Welcome to Li Feng Machinery official website to learn more, please call 400-1183-918

中文 | Sitemap | RSS | XML |
Pulping equipment

Pressure screen motor to be mounted vertically

Date:2017-11-24 Author: Click:

The installation of pressure sieve should use the lifting lugs and hanging holes on the base to lift the pressure sieve as a whole from the support plate and lay it on the foundation. When installing, the sieve body must be horizontal to make the sieve body smooth and the anchor bolt be evenly loaded. When draining emptying liquid, and should tighten all anchor bolts.

The motor is mounted vertically on the motor baseplate and the baseplate is placed on the motor rail. Triangle pulley set into the motor shaft, and make it with the triangular belt pulley sieve at the same level, the pulley is installed, look down from the top, the motor is rotated clockwise.


Url:http://en.lifengzaozhi.com/news/368.html

Tag:造纸机械厂

Browse:

Welcome to leave message
Please input the message here, we will contact you as soon as possible.
Name
Name
Phone
Phone
Email
Email
Adress
Adress